Our Shade Structure Services Include:

  • Fully Engineered Structures
  • Sealed Engineering Plans for all 50 States
  • Engineering & Design Assistance
  • 30 to 45 Days for Structure Delivery After Receipt of Order and Submittal Approval
  • Multi Foundation Designs for all Geotechnical Requirements & Soil Conditions in all Regions
  • Site Specific Engineering Assistance for Special Site Conditions Included with Order
  • Structures Engineered to Withstand 115 MPH Wind Load per current  International Building Code (IBC)
  • All Structures Frames Engineered to Withstand 180 MPH Wind Load with Covers Off

*Carolina Shade Sails recommends cover removal when winds forecasted to exceed a Category 1 hurricane of 74-95 MPH, 119-153 km/